IMS Infrasound Array Station IS19

Construction and installation of the first IMS infrasound station IS19 in Djibouti. Sites preparation and construction of the 40 m2  equipment facility at Arta Observatory as Common Central Recording Facilities (CRF), and access tracks for each of the 9 sites. Concrete foundation and installation of the embedded tower section. In addition to installation of upper section for L3, L5, L6, L8, repeaters and CRF. Inflexibility is another challenge, as well as fixing the lightning attractors, connecting to the grounding system, solar panels base and installation of Antennas. Ground excavations and backfilling for the vaults, for the radio telemetry towers and fences. Provision and installation of the electrical grounding and lighting protection system. Extension to the present backup power system for the CRF at Arta Observation. Security fencing and grounding systems were also implemented. A guard facility was also designed and constructed. Solar panels have been installed at each array element and repeater site to provide power to the Commission’s Infra sound Equipment via cables driven into the conduit to the interior of the vault.

CATEGORY

Telecom & Power

YEAR

2011

LOCATION

Djibouti

CLIENT

CTBTO

VALUE

$864.3K

IMS Infrasound Array Station IS19
IMS Infrasound Array Station IS19
IMS Infrasound Array Station IS19
IMS Infrasound Array Station IS19