Construction of Water Supply and Wastewater Project in “Sahel Akkar” – North Lebanon” LOT I.

The construction of a potable water network with an approximate length of 200 km of transmission and distribution ductile iron and HDPE pipe works of various diameters ranging from 20 mm up to 400 mm The equipping of three wells in Darine town. Drilling and equipping one 150 m well in ChirHmairine town. Drill Two 400m Test Wells around Halba region. Drill One 300m Test well around Kouikhat area. Drill and test one 150m well around Tel Abbass area. The construction of three water pumping stations; one in Darine village and two in Halba Region; one in Halba city and another in upper Halba area. The construction of four regional water reservoirs in Ghzaile area (4 x 2,000m3), two ground reservoirs (1,000m3 each) in Halba Region, four water towers (300m3 capacity) one in ChirHmairine, two in Khreibeh, one in Nfaiseh and one (100m3 in Darine). The project scope also includes construction of wastewater networks with a length of approximately 65 km of pipework of various diameters up to 600mm.

CATEGORY

Water Supply

YEAR

2021

LOCATION

Lebanon

CLIENT

WARD J.V.

VALUE

$41.4M

CONSULTANT

Gulf-Spectrum Engineering Consultants L.L.C

FUNDED BY

Islamic Development Bank (IDB

CONTRACT NUMBER

19956

CONTRACT DURATION

30 Months (Completion Date 06 Mar. 2020)

Construction of Water Supply and Wastewater Project in “Sahel Akkar” – North Lebanon” LOT I.
Construction of Water Supply and Wastewater Project in “Sahel Akkar” – North Lebanon” LOT I.
Construction of Water Supply and Wastewater Project in “Sahel Akkar” – North Lebanon” LOT I.