Construction of South Beirut Coastal Collectors & Pumping Stations [Naame (Damour) – Ghadir] Supply, install and test 7.2 Km of wastewater pressure pipes; Diameter ranging between 500mm and 800mm of GRP pipes. Supply, install and test 12.5 Km of wastewater gravity pipes; Diameters ranging between 200mm and 400mm of UPVC and Concrete Pipes at Khaldeh area. Supply, install and test 18 Km of wastewater gravity pipes; Diameters ranging between 200mm and 900mm of UPVC and Concrete Pipes. Construct, equip and commission Khaldeh (PS0), Naamé (PS1) and Damour (PS2) sewerage pumping stations: concrete buildings, pumps and electromechanical works, transformers and electrical connections with Electricité du Liban (E.D.L.) Construction of 900 manholes and emergency generators.
CATEGORY
Sewerage & Drainage
YEAR
2009
LOCATION
Lebanon
CLIENT
Council for Development & Reconstruction
VALUE
$12.7M