Supply and laying around 65.565 km of gravity wastewater lines diameter going from 200 mm up to 600 mm. Supply and laying around 2.423 km of pumping lines diameter going from 80 mm up to 150 mm. Construction of Tannourine el Tahta (PS1) wastewater pumping station. Construction of KfarHelda (PS2) wastewater pumping station. Construction of Daal (PS3) wastewater pumping station. Construction of the treatment plant in KfarHelda
CATEGORY
Water Supply
LOCATION
Lebanon
CLIENT
Ministry of Energy and Water (MEW)
VALUE
$30.7M
CONSULTANT
Bureau Technique pour le Développement (BTD)