AMEDI Water Supply Project

Construction of Water intake structure, including low lift pumping station. The construction of a water treatment plant had a nominal design capacity of 2,400 m3/hour. Supply and installation of water transmission pipelines and related reservoirs; approx. 90 Km of Ductile Iron pipes diameter varying between 50mm and 700mm, class k9. Construction of booster stations (Three stations or more according to design). Construction of distribution (four storage ground) reservoirs in different places. Associated power transmission and transformation facilities. Operation of the complete project package for two years.

CATEGORY

Water Supply

YEAR

2014

LOCATION

Iraq

CLIENT

Ministry of Municipality and Tourism - IRAQ

VALUE

$90.3M